Your roof price.
In 60 minutes.
No home visit.
Enter your address. Pick your shingle. Buy online. No salesperson ever contacts you.
"Got a quote in 38 minutes for less than three local roofers I'd been quoted by. No salesman in my living room. Crew showed up on the day they said."
"We were terrified we'd get scammed because every roofer we called pressured us. Roofana sent a fixed price, we picked the date, done."
"I'm a 70-year-old widow and was scared of being taken advantage of. The price online was the price I paid. Crew was respectful, on-time."
"Had a hailstorm in October. They walked us through the insurance process step by step. Insurance covered the replacement. Honest people."
"Compared three competitors. Roofana was $2,400 cheaper for the same Owens Corning Duration shingle. Best price guarantee held up."
"Financed through Hearth in about a minute, no impact to my credit. Monthly payment was less than I expected. Roof looks incredible."
The smarter way to buy a new roof.
| Compare | Roofana | Traditional roofer |
|---|---|---|
| Quote turnaround | Under 60 minutes, online | 1–2 weeks of phone tag |
| Home visit required | Never — aerial measurement | Mandatory, often two visits |
| Pricing model | Fixed all-in, locked before you sign | Negotiated, varies by salesperson |
| Sales pressure | Zero. Buy when you're ready. | High-pressure "today only" tactics |
| Permits & inspections | Handled for you, included | Sometimes a line item, sometimes "your problem" |
| Manufacturer certification | GAF / Owens Corning / CertainTeed | Varies — verify yourself |
| Financing | Pre-qualified in 60s, soft credit pull | Hard credit pull, paper application |
| Project tracking | Online dashboard, real-time | Phone calls, email threads |
From address to ordered,
in four clicks.
We replaced the salesman, the home visit, and the haggling with software, satellite imagery, and an online checkout.
Aerial imagery loads in seconds. Confirm the pin's on your home — we measure every facet, pitch, valley, and ridge automatically.
Three tiers, photo-real samples, with starting price. Choose architectural asphalt, designer impact-resistant, or standing-seam metal.
Lock the fixed price, choose the install week that works for you. Permits and material orders kick off the moment you confirm.
Pay in full from cash, savings, or an insurance payout — or finance monthly with Hearth. 60-second pre-qualification, soft credit pull only.
You’ll always know exactly
where things stand.
Every Roofana customer gets a private project dashboard the moment they purchase. Real-time progress, every document, direct access to your project manager, and an AI that can answer questions at 2am. No chasing. No wondering. No surprises.
A 9-step tracker follows your project from estimate to job complete. The moment anything changes — materials ordered, permit approved, crew assigned — you see it. No phone tag required.
Estimate, signed contract, building permit, manufacturer warranty, labor warranty — all downloadable, forever. No lost paperwork, no filing cabinets. Share with your insurance company in one click.
Your Roofana AI has full access to your project details and can answer questions about materials, scheduling, weather delays, and payments — day or night. Every conversation is logged automatically to your Communications tab.
Your dashboard is created the moment you get your estimate — free, no credit card needed.
See my roof price →Three options. Fixed prices.
No surprises.
- Algae-resistant coating
- Class A fire-rated
- 130 mph wind warranty
- 25-year limited warranty
- SureNail® Technology strip
- Impact-resistant Class 4
- Insurance discount eligible
- Lifetime limited warranty
- 50+ year service life
- Energy Star reflective
- Hail & wildfire rated
- 50-year paint warranty
Manufacturer-certified.
Fully insured. Verifiable.
Every Roofana install is performed by a top-tier certified crew you can verify before they show up.
Real questions.
Real answers.
Still have a question we didn't cover? Call us or start a quote — your address is the only thing we need.
(888) 555-766301How does the instant roof quote work?
Enter your address and we pull high-resolution aerial imagery of your roof. Our software measures every facet, pitch, valley, and ridge — typically within 60 minutes. You receive a fully-installed, fixed-price quote that includes materials, labor, permits, tear-off, debris haul-away, and the manufacturer warranty. No home visit required.02Is the price really fixed?
Yes. The price you see is the price you pay. We commit to it before you sign — no surprise upcharges for decking repairs, flashing, vents, or "we found something underneath." If the unexpected does happen, we cover it. That's the Roofana commitment.03Who actually installs my roof?
Manufacturer-certified, fully-insured local crews from our nationwide partner network. Every Roofana crew is GAF Master Elite, Owens Corning Platinum Preferred, or CertainTeed SELECT ShingleMaster certified — the top tier with each manufacturer. We background-check, vet, and continually score every crew.04What warranty do I get?
Two warranties: a manufacturer-backed shingle warranty (25 years to lifetime, depending on your tier) and a Roofana workmanship warranty on the installation itself. Because our crews are top-tier certified, eligible roofs qualify for the manufacturer's strongest extended warranty options.05Do you handle permits and inspections?
Yes. Permits, code compliance, and final inspections are handled by Roofana as part of your fixed price. You don't deal with the city — we do.06What financing options do you offer?
We partner with Hearth for residential financing. Soft credit pull only (no impact to your credit score), 0% intro APR offers available, terms up to 144 months, and project sizes from $1,000 to $100,000. Pre-qualification takes about 60 seconds.07Can you work with my insurance after a storm?
Yes. We offer free post-storm inspections, document hail and wind damage with date-stamped reports adjusters accept, and meet with your insurer's adjuster on-site if required. Once approved, we install with you only paying your deductible.08What if I'm not satisfied?
Every install is backed by a Roofana satisfaction guarantee in addition to the manufacturer warranty. If there's a workmanship issue, we send the crew back at no cost. We'd rather lose money on a single job than lose a customer's trust.
Get your roof price
in 60 minutes.
No salesperson. No home visit. Fixed price, guaranteed.
4.9★ from 1,240 homeowners · No credit card required · Takes 2 minutes